Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : IN2440987 Federal Type : NTNC
Water System Name : WESTVIEW ELEMENTARY SCHOOL State Type : NTNC
Principal County Served : LAGRANGE Primary Source : GW
Status : A Activity Date : 01-01-1976

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT QT 04-01-2016 04-30-2018 1/1 12/31 3100 COLIFORM (TCR)
1 RT QT 07-01-2018 1/1 12/31 3100 COLIFORM (TCR)
3 TR MN 05-01-2018 05-31-2018 5/1 5/31 3100 COLIFORM (TCR)
3 RP DL 04-19-2018 05-03-2018 4/19 5/3 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 4

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 5 RT 3Y 06-01-2018 to 09-30-2018 06-01-2021 to 09-30-2021
TP001 TREATMENT PLANT RINT REG IOC-NTNC-NO CYAN 1 RT 3Y 01-01-2018 to 12-31-2018 01-01-2021 to 12-31-2021
TP001 TREATMENT PLANT RS28 REG SOC-PCBDIOX 1 RT 3Y 01-01-2019 to 12-31-2019 01-01-2022 to 12-31-2022
TP001 TREATMENT PLANT RV21 REG VOC 1 RT 3Y 01-01-2018 to 12-31-2018 01-01-2021 to 12-31-2021
Total Number of Schedules Displayed = 4

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 3014 E. COLI 1 TG 1T 04-18-2018 to 05-02-2018 One Time Monitoring
TP001 TREATMENT PLANT 1005 ARSENIC 1 RT YR 04-01-2018 to 06-30-2018 04-01-2019 to 06-30-2019
TP001 TREATMENT PLANT 1024 CYANIDE 1 RT 3Y 01-01-2018 to 12-31-2018 01-01-2021 to 12-31-2021
TP001 TREATMENT PLANT 1040 NITRATE 1 RT YR 01-01-2018 to 12-31-2018 01-01-2019 to 12-31-2019
Total Number of Schedules Displayed = 4

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
LEAD CONSUMER NOTICE OF RESULTS 12-31-2012
LEAD CONSUMER NOTICE OF RESULTS 12-31-2018
Total Number of Compliance Schedules Displayed = 2

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Tue Apr 24 12:39:39 EDT 2018